[pb_slideshow group=”6″]

The project consisted of a retrofit of the existing pumping station and the install of a new Ultra Violet System. All stainless piping was prefabricated in our shop, with 100% X-ray requirements. The project was multi-phased, with the plant staying in full operation throughout the entire project duration.