The new Westmount Public School (WRDSB) in Kitchener¬† is a two floor school with a 10 month build cycle to replace the existing school on the same property. Dean-Lane’s scope includes plumbing, heating, insulation and controls and the new school expected to be turned over to at the end of June 2015. Dean-Lane will assist in decommissioning the existing Westmount Public School before the start of the 2015/2016 school year in collaboration with various other trades.